Guide
Repairs: from report to closed job
Most repair problems in a lettings agency are not about the repair. They are about the gaps: a report sits in an inbox, nobody knows who owns it, the tenant never hears back. This guide walks the whole path in the order it happens. It is general guidance, not legal advice.
Whose job is the repair?
Usually the landlord's. GOV.UK says the landlord is always responsible for repairs to the structure and exterior, fire safety, sanitary fittings, heating and hot water, gas appliances and electrical wiring. Common areas are usually theirs too. See GOV.UK on repairs.
Your agency acts for the landlord, so your job is to get it done properly within what the landlord has agreed. Know each landlord's spending limit before the first report arrives, not after.
What should happen when a tenant reports a problem?
Capture it in one place, with the property, the fault and a photo, then check whether it is an emergency before anything else. GOV.UK tells tenants to act straight away on faults that could harm their health, such as faulty electrical wiring. Your intake should do the same.
- One route in, whether the tenant uses a form, email or phone. Write phone reports into the same record.
- Ask for a photo and a short description. Both save a wasted visit.
- Sort emergencies first. Gas smell, no heating in winter, flooding and exposed wiring do not wait for a queue.
- Confirm receipt to the tenant the same day.
Eve's tipA tenant who hears "we have it and here is what happens next" rings you far less often. Send that message before you have any answers.
When does the landlord need to approve?
When the cost goes above what the landlord has agreed you can spend without asking. Agree a limit per landlord in writing, send anything above it for a clear yes or no, and never treat a missing quote as a zero. Emergencies are the exception, where making the property safe comes first and you tell the landlord straight after.
Give the landlord everything in one message: the fault, the photo, the quote and the choice. A landlord who has to ask three questions takes three days.
How do you choose and brief a contractor?
Pick on trade, area and availability, then give a brief that needs no follow-up call: address, fault, photos, access arrangements and a response deadline. Set the deadline when you send the job. If nobody answers in time, move to the next contractor rather than waiting.
Keep access simple. Tell the tenant who is coming and when before the visit, not on the doorstep.
How do you know a job is really finished?
When you have photos from the contractor, the tenant has had the chance to say whether it is fixed and the paperwork is on file. A contractor saying "done" is not proof. Ask for before and after photos on every job, and let the tenant confirm or reopen.
Decide in advance what happens if the tenant stays silent. A clear rule, such as closing after a set number of days with the record showing the tenant did not confirm, stops jobs hanging open for months without pretending anyone agreed.
How often should you update the tenant and landlord?
At every change of state, and no more than that. The tenant wants to know the report was received, when the contractor is coming and when the job is closed. The landlord wants to know about cost, approval and completion. Anything beyond those moments is noise, and anything missing is a phone call.
Write each message so it makes sense on its own. Nobody should have to scroll back through a thread to learn what the update is about.
What should you keep on file?
The original report, the photos before and after, the quote, the landlord's decision and who was told what and when. If a landlord later asks why a bill was paid, or a tenant says nothing was done, you can answer from the file rather than from memory. It is also the quickest way to see which properties keep generating the same job.
The whole path at a glance
| Stage | Who acts | Done when |
|---|---|---|
| Report | Tenant | Logged with property, fault and photo |
| Emergency check | Agency | Urgent faults routed straight to dispatch |
| Approval | Landlord | Within limit, or a clear yes or no recorded |
| Dispatch | Contractor | Accepted with a date the tenant knows |
| Visit | Contractor | Before and after photos uploaded |
| Close | Tenant and agency | Tenant confirmed, or the rule for silence applied and recorded |
What if the same fault comes back?
Reopen the original job instead of starting a new one. You keep the history, you can see the contractor's earlier visit and the landlord is not asked to approve the same problem twice. Repeat faults are also the clearest sign a contractor needs a conversation.